
Commercial slab replacement
The old floor slab came out in sections with two compact excavators and a skid steer working inside the building, spoil staged and hauled through the loading doors, walls protected under poly the whole time.
A sample of recent jobs, every one photographed on site by our own crew.

The old floor slab came out in sections with two compact excavators and a skid steer working inside the building, spoil staged and hauled through the loading doors, walls protected under poly the whole time.

Three-dimensional hex tile run floor to ceiling behind a double vanity, with the sconces and mirrors set to the tile layout rather than the other way round.

Same room, same camera position. The sunken tub and brown tile came out to the studs; it went back as a curbless walk-in shower with large-format porcelain, a floating vanity and a lit mirror.

A round sunken patio cut into a sloped back yard: the wall went up first on a compacted base, then the pavers were laid to string lines, and the lawn around it was re-sodded.

A treed residential lot cleared, stumped and graded with an excavator and a tracked skid steer, keeping the mature trees at the edges that the owners wanted to save.

A tiled walk-in shower with a frameless glass enclosure and a recessed niche, next to a freestanding tub and a new vanity.