Ground up / full height
Demolition
Controlled removal, not a wrecking ball. Most GTA demolition happens six feet from a neighbour who is home.

Full teardowns, selective interior strip-outs, and structural removal where a wall is coming out and something has to hold the house up while it happens. Dust control, asbestos protocol and disposal manifests are part of the job, not an extra.
Worth knowingOntario requires a designated substance survey before most demolition. We arrange it — it is not something to skip.
What this includes
- Full residential and commercial teardown
- Selective interior strip-out to studs
- Load-bearing removal with temporary shoring
- Designated substance survey coordination
- Asbestos and mould abatement management
- Concrete and slab breakout
- Sorted disposal with weigh tickets
The rest of the property.
Because we run all of it, demolition does not stall waiting on a trade that has not returned your call.